Amendment 4:2026 – What Electricians Need to Know About the Next 18th Edition Update

Amendment 4:2026 – What Electricians Need to Know About the Next 18th Edition Update

The IET Wiring Regulations (BS 7671:2018, 18th Edition) are set for another major update. After Amendment 2 (2022) and the free Amendment 3 (2024), the industry is now preparing for Amendment 4:2026 Wiring Regulations.

This update is expected to be the most wide-ranging since the 18th Edition launched in 2018. Here’s what it means for electricians — and how you can prepare.


Why Amendment 4 Matters

The Wiring Regulations evolve to keep pace with:

  • European harmonised standards (through CENELEC).
  • UK legislation, including the Building Safety Act.
  • New technology such as battery storage and PoE systems.

The IET and BSI ran a Draft for Public Consultation (7 August – 3 November 2024), and the final publication is expected in 2026.


Key Draft Changes in Amendment 4

Chapter 52 – Ferromagnetic Enclosures and Eddy Currents

  • Regulation 521.5.1 has been redrafted.
  • Previously, all AC conductors in a circuit had to pass through the same hole in a ferromagnetic enclosure to avoid excessive heating from induced magnetic fields.
  • New note: For switchgear/controlgear assemblies to BS EN IEC 61439, circuits up to 200 A can pass through separate holes in ferromagnetic material.
  • Above 200 A, designs must be verified by temperature-rise tests.

Read “Amendment 4 and Consumer Units” to find out more

Section 545 – Functional Earthing for ICT

  • New requirements for ICT, broadcast, and network systems.
  • Clear distinction between functional earthing and protective earthing.
  • Rules for bonding, identification, and continuity of conductors.

Chapter 57 – Stationary Secondary Batteries

  • Dedicated chapter on battery storage installations.
  • Domestic systems must comply with PAS 63100.
  • Fire protection measures linked to the building’s risk assessment.

⚡ Section 716 – Power over Ethernet (PoE)

  • Rules for distributing ELV DC power over IT cabling.
  • Applies to both new and existing telecoms infrastructure.
  • Covers balanced cables and accessories primarily designed for data transmission.

Section 551 – Low-Voltage Generating Sets

  • Expanded detail on bidirectional energy flow and protective devices.
  • Restrictions on connecting sources downstream of RCDs.
  • Clarified requirements for systems operating in parallel with other supplies.

Section 710 – Medical Locations

  • Extended provisions for Group 2 medical areas.
  • Stronger rules to avoid single-fault power loss.
  • Updated requirements for insulation monitoring and supplementary bonding.

Section 537 – Firefighter’s Switches

  • Placement now tied to the building’s fire strategy.
  • Must be specified by the fire engineer, with practical examples provided.

✅ Chapter 65 – Periodic Inspection & Testing

  • Condition Reports must follow the revised Appendix 6 model.
  • Reports may now include photographic or thermographic evidence.

♻️ Chapter 81 – Energy Efficiency

  • Ensures energy efficiency is considered at design, installation, and verification stages.
  • New chapter introducing efficiency requirements for electrical installations.
  • References BS HD 60364-8-1:2019 and UK Building Regulations.

What Electricians Must Do Now – Amendment 4:2026 Wiring Regulations

Until Amendment 4 is published, compliance means working to:

  • Amendment 2 (2022) – the brown book.
  • Amendment 3 (2024) – the free PDF bolt-on.

Future-proof your work by understanding how Amendment 4 will affect:

  • Battery storage installations (domestic & commercial).
  • ICT and PoE cabling systems.
  • Healthcare projects.
  • Energy-efficient builds.

Amendment 4:2026 – What Electricians Need to Know About the Next 18th Edition Update
Amendment 4:2026 – What Electricians Need to Know About the Next 18th Edition Update

Stay Compliant with Electrical4Less

At Electrical4Less, we stock the products and publications you need to stay current:

Plus all the essential hardware for safe installs:


About Electrical4Less – Amendment 4:2026 Wiring Regulations

Based in Fulham, London, Electrical4Less is a trusted trade counter and online supplier. As members of the IBA buying group and the EDA, we supply electricians across the UK with:

  • Fast delivery.
  • Competitive pricing.
  • Friendly trade-counter support.

We’re electricians’ first choice for consumer units, RCBOs, cable, and publications.


FAQs – Amendment 4:2026 Wiring Regulations

Q: When does Amendment 4 come into effect?

A: Publication is expected in 2026, after consultation closes and committee approval.

Q: Do I need to follow Amendment 4 now?

A: No — you must currently comply with Amendment 2 (2022) and Amendment 3 (2024).

Q: Will Amendment 4 affect domestic installs?

A: Yes — especially where battery storage and energy efficiency are concerned.

Q: Where can I buy the official Wiring Regulations?

A: You can buy the IET Wiring Regulations (18th Edition) and guidance notes directly from Electrical4Less.


Stay Connected – Amendment 4:2026 Wiring Regulations

Follow us for updates, product news, and industry insights:

Join the conversation and share your thoughts on Amendment 4 with us on social media.


References

Leave a Reply

Your email address will not be published. Required fields are marked *